A comprehensive compilation of 16 High-Voltage EHV Substation, Switchyard, Transmission Line, and Railway Electrification projects executed by our promoters and technical management under our associated organization (DCC) and DIEPL.

Audit & Tender Notice: The projects cataloged below represent the combined structural and electrical contracting scale executed by our promoter group (under the legacy name Durga Construction Company - DCC and the newly registered corporate entity Durga Infrastructure Engineering Private Limited - DIEPL) from 2012 to 2026.

Ongoing Project 2026

TEECL / AESL (Adani Energy Solutions)

400/220/132KV Rewa (New), Amarpatan Substation (New), and Bay Extension complete Erection & Electrical works. Complete structural staging, EHV busbars, isolators, and HT cabling synchronization.

Executed by: DIEPL Direct Rs. 9,50,00,000

Site Location: Rewa, Madhya Pradesh

Ongoing Project 2025

Gepdec Infratech Ltd. / SAIL

220/33KV complete switchyard erection works, including heavy structural columns staging, equipment alignment, and MS grounding grids layouting for SAIL Iron Mines.

Executed by: DCC Rs. 90,00,000

Site Location: Taldih, Odisha

Ongoing Project 2025

SCPL (ARSS) / Indian Railways

1 x25 KV OHE Civil & Electrical complete works, including foundation excavation, steel portals structure erection, overhead line conductor stringing, and testing support for RE Railways.

Executed by: DCC Rs. 1,10,00,000

Site Location: Daspalla to Puranakatak, Odisha

Ongoing Project 2024

SCPL (ARSS) / DFCC Railways

2 x25 KV OHE & PSI Civil & Electrical complete works for Dedicated Freight Corridor (DFCC) projects, including traction substations structures rigging and power cabling layups.

Executed by: DCC Rs. 5,50,00,000

Site Location: Gomho to Pradhankhanta, Jharkhand

Completed Project 2023

TATA Projects Limited / Railways RE

Executed complete Civil & Electrical Works for Railway Electrification (RE) Projects up to testing & commissioning, including Traction Power Substation (TSS), portal structure erection, and HT cabling.

Executed by: DCC Rs. 1,50,00,000

Site Location: CLW & SOT, Uttar Pradesh

Completed Project 2022

ARSS Infrastructure Projects Ltd. / RVNL

Executed complete Civil & Electrical Works for RVNL Projects up to testing & commissioning, including TSS, SP/SSP, safety grounding, structure erection, and outdoor auxiliary equipment bay alignments.

Executed by: DCC Rs. 1,15,00,000

Site Location: Sukinda, Odisha

Completed Project 2022

Gepdec Infratech Ltd. / GED Goa

220/110KV Substation Renovation, including Erection, Testing, and active assistance in Grid Commissioning work for Goa Electricity Department (GED) switchyards.

Executed by: DCC Rs. 75,00,000

Site Location: Ponda / Thivim, Goa

Completed Project 2021

Gepdec Infratech Ltd. / Jaunpur

400/220/132KV AIS Substation complete outdoor structural steel erection, isolator alignments, EHV CT/PT staging, and cabling installations.

Executed by: DCC Rs. 1,00,00,000

Site Location: Jaunpur, Uttar Pradesh

Completed Project 2019

Gepdec Infratech Ltd. / JUSNL

132/33KV Substation Renovation & electrical works for Jharkhand Urja Sancharan Nigam Limited (JUSNL), including CRP panel dressing and earthing matrix repairs.

Executed by: DCC Rs. 25,00,000

Site Location: Jamshedpur, Jharkhand

Completed Project 2018

KEC International Ltd. / Obra RE

Executed complete Civil & Electrical Works for Railway Electrification (RE) Projects up to testing & commissioning, including Traction Substation (TSS), SP/SSP structures erection, and outdoor wiring.

Executed by: DCC Rs. 28,00,000

Site Location: Obra, Uttar Pradesh

Completed Project 2017

KEC International Ltd. / Nainpur RE

Executed complete Civil & Electrical Works for Railway Electrification (RE) Projects up to testing & commissioning, including TSS, SP/SSP, structure erection, and outdoor substation works.

Executed by: DCC Rs. 62,00,000

Site Location: Nainpur, Madhya Pradesh

Completed Project 2013

GE T&D India Limited / NTPC Singrauli

400KV/220KV outdoor Switch Yard erection, including mechanical riggings of isolators, circuit breakers, structural steel gantries placement, and control terminations.

Executed by: DCC Rs. 35,00,000

Site Location: Singrauli, Madhya Pradesh

Completed Project 2014

GE T&D India Limited / Anpara-D

765KV/400KV outdoor Switch Yard Main Grid MS safety Earthing grounding mat fabrication, layout excavation, and lap welding to maintain total grid resistance under 0.5 ohm.

Executed by: DCC Rs. 75,00,000

Site Location: Anpara-D, Sonebhadra UP East

Completed Project 2013

Alstom T&D India / Anpara-D Service

765KV/400KV outdoor Switch Yard mechanical service, alignment support, gantry structural column alignments, EHV terminations, and dielectric cabling gladding.

Executed by: DCC Rs. 45,00,000

Site Location: Anpara-D, Sonebhadra UP East

Completed Project 2013

Shyam Electricals / UPPTCL Maintenance

33/11KV Distribution Line Maintenance, insulator replacements, structural repairs, and auxiliary bay wiring renovations for Uttar Pradesh Power Transmission Corporation.

Executed by: DCC Rs. 11,50,000

Site Location: Anpara Division, Uttar Pradesh

Completed Project 2012

BBS Construction / UPPTCL Maintenance

33/11KV Distribution Line Maintenance, including safety grounding flat welds, cable trench excavations, and terminal post structural alignments in Anpara region.

Executed by: DCC Rs. 8,50,000

Site Location: Anpara Division, Uttar Pradesh